top of page

Civil Engineering Design Services – Task Order Washington Dulles International Airport Chantilly, VA

Project Gallery

Campbell & Paris Engineers Performed and administered 38 task orders for the Metropolitan IAD & DCA
Performance of all operations in connection with site investigations, planning, and engineering studies, topographical and subsurface surveys, transportation & forecasting conceptual, preliminary, and final designs, and construction phase support services

Tasks included the following:

• Rehab for Temporary Public/Employee Parking Lot (Red Lot), IAD

• South Employee Parking Expansion, IAD

• Hangar Area Site Develop/Contingency Staging and Parking, IAD

• Red Lot / Orange Lot Reconfiguration, IAD

• Ground Transportation Road Improvements, IAD

• New ARFF Station, Response Roads and Station Utilities, IAD

• New North Red Lot, IAD

• Cargo Building 6, IAD

• Red Lot Parking Expansion (Phases 3A, 3B, 4, 5, & 6), IAD

• Perimeter Security Fence and Access Highway Fence Improvements, IAD

• Relocation Air Rescue Fire Facility (ARFF), IAD

• Bus Maintenance Facility Phase 1B, IAD

• Replace Air Traffic Control Tower Water and Sewer Lines, IAD

• Metal Shop Storage Building, Shop 2 Area, IAD

• Topographical Survey (Apron Area), DCA

• Taxi Lot Connector Road, IAD

• Natural Gas Line Cathodic Protection, IAD

• Graphic Design Services for the Main Terminal Directories, IAD

• Climate Control Analysis Salt / Sand Facility, IAD

• Pavement Evaluation Taxilane C, IAD

• Metes and Bounds Survey, IAD

bottom of page